1-Re-installing the battery or accumulator.
2 - Part I, central power system, the regulator and rectifier.
3 - Part II, Central Electrical, Re-connect all the main wiring and all sub-systems.
4 - Part III, evidence of electrical system, check all lights.
0 comments:
Post a Comment